Under the Memorandum of Understanding signed on June 4, 2024, with RFI — Rete Ferroviaria Italiana, we develop integrated renewable energy solutions for transport infrastructure, starting with the EKO Energy Hub experimental prototype on the Bologna San Donato railway test circuit.

km 3+100Pilot project

EKO Energy Hub — Bologna San Donato

Experimental prototype on the Bologna San Donato railway test circuit, under the Memorandum of Understanding signed on June 4, 2024, with RFI. 11.5 m tall structure with 14 m portal span, KimaSOL digital photovoltaic panels, rainwater recovery systems, vertical wind energy, and energy storage/hydrogen readiness.

Testing started on October 15, 2026 · installation underway · technical validation expected in December

11.5 mstructure height
14 mportal span
KimaSOLdigital photovoltaic panels
km 3+200Roadmap

From vision to deployment

  1. Foundation

    Green Ways S.r.l. is founded in Rome, focusing on photovoltaic technologies for linear infrastructure.

  2. MoU with RFI

    Signing of the Memorandum of Understanding with RFI — Rete Ferroviaria Italiana for the EKO Energy Hub pilot project at the Bologna San Donato test circuit.

  3. Adamant Acquisition

    Adamant Holding Inc. (OTC: UCCPF) acquires 100% of Green Ways S.r.l., bringing international investment capacity.

  4. Testing at Bologna San Donato

    RFI authorized access to the Bologna San Donato railway test circuit: the EKO Energy Hub prototype is being installed.

  5. Technical validation

    Technical validation of the prototype with RFI expected.

  6. Planning and agreement finalization with RFI

    Defining the economic and technical agreements with RFI for the deployment of the EKO Energy Hub on non-electrified lines, covering about 4,500 km of the national railway network.

  7. FS Group target: 1.1 GW

    FS Energy plans 1.1 GW of renewable capacity by 2029, equal to 19% of the FS Group's consumption. RFI invested €11.7 billion in 2025, driven by Italy's Recovery and Resilience Plan (PNRR).

  8. FS Group target: about 2 GW

    FS Energy plans about 2 GW of renewable capacity by 2034, covering 40% of the FS Group's consumption. Italy: about 131 GW of renewable capacity by 2030 (2024 National Energy and Climate Plan).

km 3+300Concept

Stations as power plants

Concept

Roma Termini

Solar integration into the canopies of Rome's main station.

Concept

Milano Garibaldi

Vertical and semi-cylindrical photovoltaic panels integrated into Milan's infrastructure.

Concept

Mestre Venezia

Colorful photovoltaic canopies and innovative coverings for Mestre station, combining energy functionality with architectural design.

Contact

Let's build the future of energy together

Are you an investor, institutional partner, or company interested in energy transition? Contact us to explore collaboration opportunities.

Parent companyAdamant Holding Inc.OTC: UCCPF · Frankfurt: U06 TelecommunicationsOktacom Inc.Wholesale voice carrier · New York
You are hereGreen Ways S.r.l.Energy from railway infrastructure · Rome